Skip to main content

ABOUT RENDEL

Rendel Ingerop Pty Ltd, a subsidiary of Rendel Limited and the Ingerop Group, established its Sydney office in 2018.

Our focus is on infrastructure projects in Australia, supporting key clients in the country’s rapidly growing sector. Rendel has a rich history in Australia, dating back to 1952 when we designed the Kwinana Oil Refinery for British Petroleum.

Director Neil Kerridge heads up Rendel Ingerop in Sydney. In addition, Director for Industry and Energy, Matthew Lyons, strategically relocated in 2024 to support the team’s expansion, bringing over a decade of expertise in major maritime infrastructure projects. Most recently, Director Antonio Perez relocated in 2025, contributing strategic expertise in underground structures.

Rendel Ingerop Pty Ltd was established in Sydney in 2018, and focuses its services on major infrastructure, energy and industry projects.  In 2024, we expanded our presence to the West Coast with the establishment of our team in Perth. Rendel Ingerop’s key projects include Stanley Point Berth 3, Sydney Gateway, Lumsden General Cargo Facility, Melbourne Metro and Parramatta Light Rail Stage 2.

Aspec Engineering Pty Ltd, joined the Rendel Group in 2022.  Aspec Engineering is a multidisciplinary engineering specialising in material handling, ports, and infrastructure and has offices in Brisbane, (QLD), Perth (WA), Newcastle and Wollongong (NSW).  Rendel and Aspec Engineering have a successful 12-year history of collaboration on various projects in Australia. Notable joint projects include Hay Point Expansion Berth 3, Sydney Metro Northwest Rail Link and the Hay Point Berth 2 Shiploader Replacement Project.

Featured Project

Hay Point Berth 2 Independent Review

Hay Point Berth 2 Independent Review

Melbourne Metro Tunnel Shafts

Melbourne Metro Tunnel Shafts

Sydney Gateway, Australia

Sydney Gateway, Australia

Surf Lakes

Surf Lakes

Sydney Metro North West Rail Link

Sydney Metro North West Rail Link

Parramatta Light Rail Stage 2

Parramatta Light Rail Stage 2